Tue Jun 10 15:45:06 PDT 2014
- Next message: [Slony1-general] upgrading from 1.x to 2.x
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
I'm currently running 9.2.4 with slony 2.1.3. I would like to use slony to upgrade my DB as i have for a few upgrades now, but want to make sure that 2.1.3 supports 9.3.x, as I usually upgrade postgres, then I upgrade slony. I don't use pre-compiled binaries and I create a single rpm with postgres/slon built together. So my steps are usually roll out the new rpm to my slaves, drop and add, they will then be getting data loaded as 9.3.4 wants it, but would still be running slony 2.1.3. After my query slaves and switchover slave are updated this way, I switchover between my master (still running 9.2.4/2.1.3) and my slave (now running 9.3.4/2.1.3), and then I can drop add the old master and bring it to 9.3.4/2.1.3). Thanks Tory -------------- next part -------------- An HTML attachment was scrubbed... URL: http://lists.slony.info/pipermail/slony1-general/attachments/20140610/7491b93c/attachment.html
- Next message: [Slony1-general] upgrading from 1.x to 2.x
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the Slony1-general mailing list