Hi,

 

I've got a 2 node's slony 1.6.2.2 cluster and I'm inserting 400
records/second in tables with length 1 day. The records are very simple so I
don't have any problems during normal synchronisation processes. However,
when I want to switchover the nodes, I find that sometimes this operation
takes me 1 minute and other times it takes me 15 minutes.

The reason is that the times it needs 15 minutes to achieve, the cleanup
thread is performing a delete logs operation that needs about 14 minutes:

 

DEBUG1 cleanupThread:  842.121 seconds for delete logs

 

Can somebody tell me why this operation needs so much time and how can I
tune the application in order to reduce this delay?

 

Thanks a lot,

 