Wed Jan 13 05:58:47 PST 2010
- Previous message: [Slony1-general] drop node not working correctly
- Next message: [Slony1-general] Cleanup operation
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
Hi, I've got a 2 node's slony 1.6.2.2 cluster and I'm inserting 400 records/second in tables with length 1 day. The records are very simple so I don't have any problems during normal synchronisation processes. However, when I want to switchover the nodes, I find that sometimes this operation takes me 1 minute and other times it takes me 15 minutes. The reason is that the times it needs 15 minutes to achieve, the cleanup thread is performing a delete logs operation that needs about 14 minutes: DEBUG1 cleanupThread: 842.121 seconds for delete logs Can somebody tell me why this operation needs so much time and how can I tune the application in order to reduce this delay? Thanks a lot, Amaya -------------- next part -------------- An HTML attachment was scrubbed... URL: http://lists.slony.info/pipermail/slony1-general/attachments/20100113/06a40fbc/attachment.htm
- Previous message: [Slony1-general] drop node not working correctly
- Next message: [Slony1-general] Cleanup operation
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the Slony1-general mailing list